How many vehicles are in scope for potential electrification in the next 24 months?
Accepts a numeric value
Whole numbers only
Which duty cycles apply to the vehicles in scope? Select all that apply.
- Last-mile/parcel
- Linehaul/long-haul
- Regional/short-haul
- Yard/terminal tractors
- Service/technician routes
- Mixed/variable
What is our current stage with EV deployment? Select one.
- Already operating EVs
- Piloting EVs
- Planning within 12 months
- Planning in 12–36 months
- No plans
Where will most charging occur in the initial phase? Select one.
- Depot/yard
- On-route public DC fast charging
- Customer sites
- A mix of these
How many depots or yards require charging in the first 12 months?
Accepts a numeric value
Whole numbers only
Overall, our sites are ready (capacity and space) for initial charger installation.
Range: 1 – 10
Min: Not at all readyMid: Somewhat readyMax: Fully ready
Approximately how many chargers are needed in the next 12 months?
Accepts a numeric value
Whole numbers only
Target start date for installing chargers at the first site.
Status of engagement with the local electric utility for EV charging. Select one.
- Already engaged utility
- Engaging within the next 3 months
- Not yet engaged
- Not applicable
Confidence selecting optimal tariffs and managing demand charges.
Scale: 10 (star)
Min: LowMax: High
Which strategies are under consideration for peak management or cost control? Select all that apply.
- Managed/smart charging
- Onsite battery storage
- Solar PV
- Backup generator
- No plans yet
How important is charging uptime resilience (e.g., backup, redundancy) to operations?
Range: 1 – 10
Min: Not importantMid: Moderately importantMax: Critical
Current training coverage for EV operations:
Rows | None | Intro/awareness | Hands-on | Certified/qualified |
---|
Drivers | • | • | • | • |
Dispatch/operations | • | • | • | • |
Maintenance/technicians | • | • | • | • |
Safety/compliance | • | • | • | • |
Facilities/electricians | • | • | • | • |
Which EV safety procedures are in place or in development? Select all that apply.
- High-voltage PPE
- Isolation/lockout procedures
- Incident response plan
- First-responder coordination
- Not established
What top people or process risks do you anticipate during the first deployments? List 2–3.
Max 600 chars
Attention check: To confirm you are reading the questions, please select "Yes".
Approximate budget for EV vehicles and charging in the next 12 months.
- No near-term budget (next 12 months)
- Under $100k
- $100k–$499k
- $500k–$1.9M
- $2M–$4.9M
- $5M+
Confidence in meeting EV rollout milestones in the next 12 months.
Scale: 10 (star)
Min: Very lowMax: Very high
What are the primary blockers to EV deployment? Select all that apply.
- Vehicle availability
- Charging hardware lead times
- Utility interconnection/timelines
- Upfront cost/financing
- Facility upgrades/construction
- Permitting/inspections
- Change management/training
- Data/telemetry integration
What single metric would best define success for the first EV sites?
Max 100 chars
Your primary role or function.
- Operations
- Fleet management
- Facilities/real estate
- Finance/procurement
- IT/telemetry
- Safety/compliance
- Executive sponsor
- Other
Primary site/location for your operations (city, state).
Max 100 chars
Years working in fleet or logistics operations.
Accepts a numeric value
Whole numbers only
Your management level.
- Individual contributor
- People manager
- Director/VP
- Executive sponsor
- Other
Optional contact for any follow-up (email or phone).
Max 100 chars
Any additional notes or site-specific considerations we should factor in?
Max 600 chars
AI Interview: 2 Follow-up Questions on EV Fleet Readiness
AI InterviewLength: 2Personality: Expert InterviewerMode: Fast Thank you for completing the survey—your input will directly inform our EV rollout planning.